IMM Base-TOYOTA-AIM INDUSTRIAL

Market: ICI

Year: 2018

Owner: Toyota

Consultant: IBI Group

Client: AIM Industrial

Location(s): Woodstock, ON

Contract Type: Fixed

Contract Value: $150,000.00

Project Duration: 2 Months

Project Status: Complete

Project Description: Located in Toyota’s Woodstock car plant is a new foundation required for an Injection Molding Machine. This involved demolition of the plant floor slab and new construction to make the foundation adequate for the modification.

Project Scope: RAven Construction was awarded the civil contract from AIM Industrial for this operation. The scope as outlined below:

  • Installation of a sealed hoarding system from the floor slab to the roof to contain construction dust during the entire length of project

  • Installation of various safety yellow painted steps and platforms in the plant

  • Saw-cut and demo the existing concrete floor slab

  • Excavation operations

  • Drill, dowel, formwork and rebar installation of slab reinstatement and IMM foundation

  • Install trench drain along entire perimeter

  • Cast-in-place concrete pour new foundation slab area for IMM Base

  • Finish, coat and seal new slab and grout IMM Base to structure

Highlights: Maintaining a dust clean environment was of top importance to protect the new cars on the line from damage. Work was situated right on the inside of a large roll up door in a low traffic area of the plant so access for construction operations was smooth with low impact to plant activities.