IMM Base-TOYOTA-AIM INDUSTRIAL
Market: ICI
Year: 2018
Owner: Toyota
Consultant: IBI Group
Client: AIM Industrial
Location(s): Woodstock, ON
Contract Type: Fixed
Contract Value: $150,000.00
Project Duration: 2 Months
Project Status: Complete
Project Description: Located in Toyota’s Woodstock car plant is a new foundation required for an Injection Molding Machine. This involved demolition of the plant floor slab and new construction to make the foundation adequate for the modification.
Project Scope: RAven Construction was awarded the civil contract from AIM Industrial for this operation. The scope as outlined below:
Installation of a sealed hoarding system from the floor slab to the roof to contain construction dust during the entire length of project
Installation of various safety yellow painted steps and platforms in the plant
Saw-cut and demo the existing concrete floor slab
Excavation operations
Drill, dowel, formwork and rebar installation of slab reinstatement and IMM foundation
Install trench drain along entire perimeter
Cast-in-place concrete pour new foundation slab area for IMM Base
Finish, coat and seal new slab and grout IMM Base to structure
Highlights: Maintaining a dust clean environment was of top importance to protect the new cars on the line from damage. Work was situated right on the inside of a large roll up door in a low traffic area of the plant so access for construction operations was smooth with low impact to plant activities.